Institute for production technology and systems
Organisational unit: Institute
- Professorship for Engineering, in particular Modelling and Simulation of Technical Systems and Processes
- Professorship for Machine Tools
- Professorship for Manufacturing – Innovative Manufacturing
- Professorship for materials mechanics
- Professorship for Materials Technology, in particular of Magnesium Materials
- Professorship for Process Measurement Technology and Intelligent Systems
- Professorship of Control and Drive Systems
- Professorship of Production Management
Organisation profile
The members of the Institute for Production Technology and Systems (IPTS) carry out work on a wide range of engineering-related research questions.
When it comes to subjects, the members of the Institute concentrate on the topics of supply chain management and production management, as well as on measurement, control, plasma, production and material technology. Within these fields, we aim to answer current research questions through both experimental work and the use of digital modelling. Our overarching goal here is to provide better solution strategies for complex problems within the field of engineering.
MoBAStra: Model-based determination of the appropriate order processing strategy from an economic and logistical point of view
01.11.19 → 31.01.22
Project: Research
Modellierung der dynamischen Rekristallisation beim Rührreibschweißen
01.09.16 → 31.10.17
Project: Research
Modellierung, Simulation und Regelung eines E-Antriebs mit Range Extender
Mercorelli, P., Werner, N. & Haus, B.
01.08.17 → 31.07.19
Project: Research
Model simulation and design control of Peltier Cells for cooling applications
01.03.14 → 28.02.19
Project: Research
New Mathematical Methods for the Analysis and Design of Intereoperable Electrical Rail Vehicles
Mercorelli, P. & Terwiesch, P.
20.07.98 → 19.07.00
Project: Research
TM 1.3 C F&E-Projekt 01 - Operations Excellence: Operations Excellence für kleine und mittlere Unternehmen
Schleich, H., Japsen, A. & Nolte, C.
19.08.09 → 31.12.16
Project: Transfer (R&D project)
Optimal robot scheduling of an AGV in the RCLL and introduction of team Leuphana
Georgiadis, A., Meier, N., Voß, T. & Heger, J.
04.07.16 → 04.07.16
Project: Research
Franatech VII: Optimierung der Produktionsabläufe bei einem Unternehmen der maritimen Wirtschaft
01.05.21 → 30.04.22
Project: Transfer (R&D project)