Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios

Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenForschungbegutachtet

Standard

Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios. / Scholz-Reiter, Bernd; Heger, Jens; Hildebrandt, Torsten.

Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II. Hrsg. / S. I. Ao; Craig Douglas; W. S. Grundfest; Jon Burgstone. Band 2 Newswood Limited, 2009.

Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenForschungbegutachtet

Harvard

Scholz-Reiter, B, Heger, J & Hildebrandt, T 2009, Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios. in SI Ao, C Douglas, WS Grundfest & J Burgstone (Hrsg.), Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II. Bd. 2, Newswood Limited, World Congress on Engineering and Computer Science - 2009, San Francisco, USA / Vereinigte Staaten, 20.10.09. <http://www.iaeng.org/publication/WCECS2009/WCECS2009_pp921-927.pdf>

APA

Scholz-Reiter, B., Heger, J., & Hildebrandt, T. (2009). Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios. in S. I. Ao, C. Douglas, W. S. Grundfest, & J. Burgstone (Hrsg.), Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II (Band 2). Newswood Limited. http://www.iaeng.org/publication/WCECS2009/WCECS2009_pp921-927.pdf

Vancouver

Scholz-Reiter B, Heger J, Hildebrandt T. Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios. in Ao SI, Douglas C, Grundfest WS, Burgstone J, Hrsg., Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II. Band 2. Newswood Limited. 2009

Bibtex

@inbook{42544a13e9934070a9862023a76f6bc9,
title = "Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios",
abstract = "There has been a lot of research about schedulingmanufacturing systems with dispatching rules in the past.However, most studies concentrate on simplified scenariosconsidering only one type of resource, usually machines.In this study dispatching rules are applied to a more realisticscenario, which is dual constrained by machines and operatorsand has a re-entrant process flow. Interdependencies ofdispatching rules are analyzed by long-term simulation.Strength and weaknesses of various priority rule combinationsare determined under different utilization levels. To gainfurther insights into the problem we additionally solve staticinstances optimally and with priority rules. For the optimalsolutions we extend a mixed integer linear program (MILP) ofthe production system to cover operators and re-entrantprocess flows. ",
keywords = "Engineering",
author = "Bernd Scholz-Reiter and Jens Heger and Torsten Hildebrandt",
year = "2009",
language = "English",
isbn = "978-988-18210-2-7",
volume = "2",
editor = "Ao, {S. I. } and Craig Douglas and Grundfest, {W. S.} and Jon Burgstone",
booktitle = "Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II",
publisher = "Newswood Limited",
address = "China",
note = "World Congress on Engineering and Computer Science - 2009, WCECS 09 ; Conference date: 20-10-2009 Through 22-10-2009",
url = "http://www.iaeng.org/WCECS2009/",

}

RIS

TY - CHAP

T1 - Analysis And Comparison Of Dispatching RuleBased Scheduling In Dual-Resource Constrained Shop-Floor Scenarios

AU - Scholz-Reiter, Bernd

AU - Heger, Jens

AU - Hildebrandt, Torsten

N1 - Conference code: 2

PY - 2009

Y1 - 2009

N2 - There has been a lot of research about schedulingmanufacturing systems with dispatching rules in the past.However, most studies concentrate on simplified scenariosconsidering only one type of resource, usually machines.In this study dispatching rules are applied to a more realisticscenario, which is dual constrained by machines and operatorsand has a re-entrant process flow. Interdependencies ofdispatching rules are analyzed by long-term simulation.Strength and weaknesses of various priority rule combinationsare determined under different utilization levels. To gainfurther insights into the problem we additionally solve staticinstances optimally and with priority rules. For the optimalsolutions we extend a mixed integer linear program (MILP) ofthe production system to cover operators and re-entrantprocess flows.

AB - There has been a lot of research about schedulingmanufacturing systems with dispatching rules in the past.However, most studies concentrate on simplified scenariosconsidering only one type of resource, usually machines.In this study dispatching rules are applied to a more realisticscenario, which is dual constrained by machines and operatorsand has a re-entrant process flow. Interdependencies ofdispatching rules are analyzed by long-term simulation.Strength and weaknesses of various priority rule combinationsare determined under different utilization levels. To gainfurther insights into the problem we additionally solve staticinstances optimally and with priority rules. For the optimalsolutions we extend a mixed integer linear program (MILP) ofthe production system to cover operators and re-entrantprocess flows.

KW - Engineering

UR - http://www.iaeng.org/publication/WCECS2009/

M3 - Article in conference proceedings

SN - 978-988-18210-2-7

VL - 2

BT - Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II

A2 - Ao, S. I.

A2 - Douglas, Craig

A2 - Grundfest, W. S.

A2 - Burgstone, Jon

PB - Newswood Limited

T2 - World Congress on Engineering and Computer Science - 2009

Y2 - 20 October 2009 through 22 October 2009

ER -