Controlling the Time Synchronicity of Convergent Supply Processes

Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenForschungbegutachtet

Authors

The assembly plays a key role in ensuring the competitiveness of industrial enterprises. From a logistics perspective, one of the central challenges with assembly processes is simultaneously and punctually supplying the necessary parts at the date required. In doing so, the goal is to satisfy the customers’ desire for short through put times and high schedule reliability, thus keeping inventory related costs as low as possible. The article presents a model which enables the evaluation of the influence of the supply processes on the in due time supply situation. Applying this model supports to control the time synchronicity of onvergent supply processes.
OriginalspracheEnglisch
TitelProceedings of the World Congress on Engineering and Computer Science 2011 : Volum II
HerausgeberS. I. Ao, Craig Douglas, W. S. Grundfest, Jon Burgstone
Anzahl der Seiten5
VerlagNewswood Limited
Erscheinungsdatum2011
Seiten1150-1154
ISBN (Print)978-988-19251-7-6
PublikationsstatusErschienen - 2011
Extern publiziertJa
VeranstaltungWorld Congress on Engineering and Computer Science - WCECS 2011 - San Francisco, USA / Vereinigte Staaten
Dauer: 19.10.201121.10.2011
http://www.iaeng.org/WCECS2011/

Dokumente

Links