Controlling the Time Synchronicity of Convergent Supply Processes

Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenForschungbegutachtet

Standard

Controlling the Time Synchronicity of Convergent Supply Processes. / Beck, Sebastian; Schmidt, Matthias; Nyhuis, Peter.
Proceedings of the World Congress on Engineering and Computer Science 2011: Volum II. Hrsg. / S. I. Ao; Craig Douglas; W. S. Grundfest; Jon Burgstone. Newswood Limited, 2011. S. 1150-1154 (Proceedings of the World Congress on Engineering and Computer Science ; Band 2011, Nr. 2).

Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenForschungbegutachtet

Harvard

Beck, S, Schmidt, M & Nyhuis, P 2011, Controlling the Time Synchronicity of Convergent Supply Processes. in SI Ao, C Douglas, WS Grundfest & J Burgstone (Hrsg.), Proceedings of the World Congress on Engineering and Computer Science 2011: Volum II. Proceedings of the World Congress on Engineering and Computer Science , Nr. 2, Bd. 2011, Newswood Limited, S. 1150-1154, World Congress on Engineering and Computer Science - WCECS 2011, San Francisco, USA / Vereinigte Staaten, 19.10.11. <http://www.iaeng.org/publication/WCECS2011/WCECS2011_pp1150-1154.pdf>

APA

Beck, S., Schmidt, M., & Nyhuis, P. (2011). Controlling the Time Synchronicity of Convergent Supply Processes. In S. I. Ao, C. Douglas, W. S. Grundfest, & J. Burgstone (Hrsg.), Proceedings of the World Congress on Engineering and Computer Science 2011: Volum II (S. 1150-1154). (Proceedings of the World Congress on Engineering and Computer Science ; Band 2011, Nr. 2). Newswood Limited. http://www.iaeng.org/publication/WCECS2011/WCECS2011_pp1150-1154.pdf

Vancouver

Beck S, Schmidt M, Nyhuis P. Controlling the Time Synchronicity of Convergent Supply Processes. in Ao SI, Douglas C, Grundfest WS, Burgstone J, Hrsg., Proceedings of the World Congress on Engineering and Computer Science 2011: Volum II. Newswood Limited. 2011. S. 1150-1154. (Proceedings of the World Congress on Engineering and Computer Science ; 2).

Bibtex

@inbook{c2b53d2393864951bffc1c0572ff3784,
title = "Controlling the Time Synchronicity of Convergent Supply Processes",
abstract = "The assembly plays a key role in ensuring the competitiveness of industrial enterprises. From a logistics perspective, one of the central challenges with assembly processes is simultaneously and punctually supplying the necessary parts at the date required. In doing so, the goal is to satisfy the customers{\textquoteright} desire for short through put times and high schedule reliability, thus keeping inventory related costs as low as possible. The article presents a model which enables the evaluation of the influence of the supply processes on the in due time supply situation. Applying this model supports to control the time synchronicity of onvergent supply processes. ",
keywords = "Engineering",
author = "Sebastian Beck and Matthias Schmidt and Peter Nyhuis",
year = "2011",
language = "English",
isbn = "978-988-19251-7-6",
series = "Proceedings of the World Congress on Engineering and Computer Science ",
publisher = "Newswood Limited",
number = "2",
pages = "1150--1154",
editor = "Ao, {S. I.} and Craig Douglas and Grundfest, {W. S.} and Jon Burgstone",
booktitle = "Proceedings of the World Congress on Engineering and Computer Science 2011",
address = "China",
note = "World Congress on Engineering and Computer Science - WCECS 2011, WCECS 2011 ; Conference date: 19-10-2011 Through 21-10-2011",
url = "http://www.iaeng.org/WCECS2011/",

}

RIS

TY - CHAP

T1 - Controlling the Time Synchronicity of Convergent Supply Processes

AU - Beck, Sebastian

AU - Schmidt, Matthias

AU - Nyhuis, Peter

PY - 2011

Y1 - 2011

N2 - The assembly plays a key role in ensuring the competitiveness of industrial enterprises. From a logistics perspective, one of the central challenges with assembly processes is simultaneously and punctually supplying the necessary parts at the date required. In doing so, the goal is to satisfy the customers’ desire for short through put times and high schedule reliability, thus keeping inventory related costs as low as possible. The article presents a model which enables the evaluation of the influence of the supply processes on the in due time supply situation. Applying this model supports to control the time synchronicity of onvergent supply processes.

AB - The assembly plays a key role in ensuring the competitiveness of industrial enterprises. From a logistics perspective, one of the central challenges with assembly processes is simultaneously and punctually supplying the necessary parts at the date required. In doing so, the goal is to satisfy the customers’ desire for short through put times and high schedule reliability, thus keeping inventory related costs as low as possible. The article presents a model which enables the evaluation of the influence of the supply processes on the in due time supply situation. Applying this model supports to control the time synchronicity of onvergent supply processes.

KW - Engineering

M3 - Article in conference proceedings

SN - 978-988-19251-7-6

T3 - Proceedings of the World Congress on Engineering and Computer Science

SP - 1150

EP - 1154

BT - Proceedings of the World Congress on Engineering and Computer Science 2011

A2 - Ao, S. I.

A2 - Douglas, Craig

A2 - Grundfest, W. S.

A2 - Burgstone, Jon

PB - Newswood Limited

T2 - World Congress on Engineering and Computer Science - WCECS 2011

Y2 - 19 October 2011 through 21 October 2011

ER -

Dokumente

Links