Permeable reactive barrier technologies for groundwater remediation in Germany: Recent progress and new developments
Research output: Journal contributions › Journal articles › Research › peer-review
Standard
In: Fresenius Environmental Bulletin, Vol. 12, No. 6, 2003, p. 623-628.
Research output: Journal contributions › Journal articles › Research › peer-review
Harvard
APA
Vancouver
Bibtex
}
RIS
TY - JOUR
T1 - Permeable reactive barrier technologies for groundwater remediation in Germany: Recent progress and new developments
AU - Burmeier, Harald
AU - Rosenau, Diana
AU - Birke, Volker
PY - 2003
Y1 - 2003
N2 - In Germany, nine pioneering permeable reactive barriers (PRB) for passive in situ remediation of contaminated groundwater have been erected over the last 3-4 years, e.g., in Bernau (built 2001), Bitterfeld (1999), Denkendorf (2000), Edenkoben (1998, 2001), Karlsruhe (2000), Oberursel (2002), Reichenbach (2000), Rheine (1998) and Tübingen (1998), all revealing interesting design and engineering features. At the Edenkoben site, one can find one of today's probably the largest funnel-and-gate (F&G) systems (appr. 450 m long, equipped with six gates). This contribution provides an introduction to German PRB projects focusing on design and engineering features as well as some first major outcomes regarding the dedradation efficiency and long-term performance, where available. It is shown that F&G and related systems prevail, predominantly equipped with specially positioned or designed funnels and/or gates, e.g., relatively flat gates installed closely below ground level, or reactors receiving passively or even actively diverted/lifted groundwater. Different zerovalent iron (ZVI) types or activated carbon are the exclusively applied reactive materials in German PRBs to treat chlorinated volatile organic carbons (cVOC) and polycyclic aromatic hydrocarbons (PAH), though a biological treatment zone to degrade PAHs is planned to be set up at Offenbach, and different alternative innovative materials are currently tested in a semi-technical scope at Bitterfeld and elsewhere.
AB - In Germany, nine pioneering permeable reactive barriers (PRB) for passive in situ remediation of contaminated groundwater have been erected over the last 3-4 years, e.g., in Bernau (built 2001), Bitterfeld (1999), Denkendorf (2000), Edenkoben (1998, 2001), Karlsruhe (2000), Oberursel (2002), Reichenbach (2000), Rheine (1998) and Tübingen (1998), all revealing interesting design and engineering features. At the Edenkoben site, one can find one of today's probably the largest funnel-and-gate (F&G) systems (appr. 450 m long, equipped with six gates). This contribution provides an introduction to German PRB projects focusing on design and engineering features as well as some first major outcomes regarding the dedradation efficiency and long-term performance, where available. It is shown that F&G and related systems prevail, predominantly equipped with specially positioned or designed funnels and/or gates, e.g., relatively flat gates installed closely below ground level, or reactors receiving passively or even actively diverted/lifted groundwater. Different zerovalent iron (ZVI) types or activated carbon are the exclusively applied reactive materials in German PRBs to treat chlorinated volatile organic carbons (cVOC) and polycyclic aromatic hydrocarbons (PAH), though a biological treatment zone to degrade PAHs is planned to be set up at Offenbach, and different alternative innovative materials are currently tested in a semi-technical scope at Bitterfeld and elsewhere.
KW - Environmental planning
KW - Cleanup
KW - Groundwater
KW - In situ
KW - Passive
KW - Permeable reactive barrier
KW - PRB
KW - Remediation
UR - http://www.scopus.com/inward/record.url?scp=0038646729&partnerID=8YFLogxK
M3 - Journal articles
VL - 12
SP - 623
EP - 628
JO - Fresenius Environmental Bulletin
JF - Fresenius Environmental Bulletin
SN - 1018-4619
IS - 6
ER -